Monthly Archives: December 2010

Stab and Place: Final table

Advertisements

Posted in Uncategorized | 1 Comment

Hot Wire Team Finish Concepts

Posted in Uncategorized | Tagged , , , , , | Leave a comment

String Fab: Wrap up

Above is the final product as extruded at it’s lowest fixable height. Although the top resides at a mere 14″ from the ground, I find this setting to display the most tensioning as well as rigidity. When fully extruded to … Continue reading

Posted in Uncategorized | 1 Comment

Back at the BAC; weaving cont.

It had taken us a bit longer to get things set up than orginally thought. Esko was kind enough to stay later, but by 6:00 we had to get going. We did have to finish the pattern by hand at … Continue reading

Posted in Uncategorized | Leave a comment

Weaving during Operation

The toolpath was successful in that in did weave the pattern with the precision needed, but the tip of the fixture did allow for a bit too much “freedom”. The string and tip sometimes got caught on the head of … Continue reading

Posted in Uncategorized | Leave a comment

Stab and Place: Casting the tabletop

Posted in Uncategorized | Tagged , , | Leave a comment

Stab and Place Final Run

Posted in Uncategorized | Tagged , , | Leave a comment